Nothing goes up without the crane.

What it is. A mast, a slewing unit, a jib with a trolley, a counter-jib with ballast, and an operator two hundred feet up who cannot see the load half the time and works by radio.

How it grows. The crane climbs itself: a hydraulic frame lifts the top, a new mast section is slid in, the crane bolts it down and climbs again. Internal-climbing cranes ride up inside the building's core.

What it lifts. Steel, rebar, curtain-wall units, concrete buckets, formwork, the mechanical-floor chillers. The whole tower passes through the hook.

The rules. Load charts, wind limits, a certified operator (NCCCO), a rigger for every pick, a signal person, and a daily inspection.

The trades. Crane operator, rigger, ironworker (erecting the crane), electrician (power), mechanic (service).

Pay. $60k to $120k; the operator on a supertall is a specialist.

See it. The scale crane on the table lifts a real load; count the picks it takes to build one floor.

votechworks.com/panel.php?slug=tower-cranesQR to
reading
36 × 48 in portrait · aluminum composite, UV print, matte laminate · 166 words — within the 250-word rule · status reading

The reading behind this panel

The 3 a.m. Concrete PourCurtain WallElevator: the Vertical RailwayLand Price vs HeightSteel Frame 1885Tower CranesWho Builds a Tower (trades by floor)Why Cities Go UpWind, Load, Sway